Waterco works with the Client to provide specialist support or complete design. We work with operational staff and design partners.
We are flexible and will work as part of the Client's team, independently or in conjunction with our own associates, according to the Project's needs.
Testimonials
Dee Valley Water - Production of Total Loss Contingency Plans, 2005.
Costain Haswell - CSO chamber design and reinforced concrete detailing.
"Waterco are a professional organisation and are flexible to changes."
Maria Melton, Section Engineer, Costain Haswell, 2004
"Always a willing and friendly service with good quality work and adding value through innovative thinking on some complicated projects."
Tony Jones, Group Engineer, Haswell Consulting Engineers, 2004
Dwr Cymru Welsh Water - Detailed design of large, high pressure water main connections with thrust blocks.
"A very professional, competent and reliable consultant."
John Clifton, Client Manager, Dwr Cymru Welsh Water, 2004
Dwr Cymru Welsh Water - Production of Total Loss Contingency Plans endorsed in SEMD audits.
"Waterco are an excellent company to work with, their work is always completed to a very high standard. They produce regular progress reports, supported by very detailed audit documents of meetings, actions, costings, etc."
Bob Langdon, Emergency Planning Manager, United Utilites Operational Services, 2004.
MWH - hydraulic design of screen chambers, detention tanks and sewers for United Utilities' UID (Unsatisfactory Intermitent Discharge) programme, 2002-2003.