Paul Sinclair, Engineering Manager, 2006 - Redrow Homes (NW) Ltd
Preliminary Drainage Assessment for residential development of 49 houses.
"We are very pleased with the report submitted. It was concise, was delivered on time and said exactly what was required from our perspective."
Rodney Hamon, Architectural Designer, 2006 - Hamon Design
Flood Consequence Assessment in accordance with TAN 15 for new residential property in C1 (defended) flood zone.
"I was pleased with the FCA report content, the speed of response and the communication. They understood exactly what we needed. I have recommended Waterco to other clients and developers."
Peter Thomson, Director, 2005 - Wraysbury Homes Ltd
Agreement of principles and design of details for surface water, foul sewerage and separate highway drainage for development of 24 houses.
"I understand the complexity of the job and appreciate the speed and quality. I feel we have a good relationship and I'm pleased with the competent engineering and control of the project."
Maria Melton, Section Engineer, 2004 - Costain Haswell
CSO chamber design and reinforced concrete detailing.
"Waterco are a professional organisation and are flexible to changes."
John Clifton, Client Manager, 2004 - Dwr Cymru Welsh Water
Production of Total Loss Contingency Plans.
"Waterco are an excellent company to work with, their work is always completed to a very high standard. They produce regular progress reports, supported by very detailed audit documents of meetings, actions, costings, etc."
Bob Langdon, Emergency Planning Manager, 2004
Detailed design of large, high pressure water main connections with thrust blocks.
"A very professional, competent and reliable consultant."