flood risk assessments - pps25 compliant

Flood Risk

Flood Risk Assessments

 

Under PPS25, FRA's are required for all developments located within an identified flood risk area. All new developments greater than one hectare also require an FRA, as part of the planning process.

Waterco have an extensive experience of completing Flood Risk Assessments (FRA) that are fully compliant with Planning Policy Statement 25 (PPS25). Our knowledge and network amongst the relevant authorities have enabled us to produce over 100 reports in the last 5 years.

Waterco offers three levels of FRA reporting in line with PPS25 and will advise on which is most appropriate for your development.
 

 

FRA Level 1 - Screening Study

  • Initial enquiry into whether there are any flooding or surface water management issues which require further consideration. 

  • Ascertain if Level 2 study is required.

 

FRA Level 2 - Scoping Study

  • Qualitative appraisal of the sites flood risk and its potential impact elsewhere.

  • Production of a preliminary FRA report in accordance with PPS25.

 

FRA Level 3 - Detailed Study

  • Undertaken if the Environment Agency require further quantitative analysis. 

  • Production of a full FRA report possibly including catchment analysis, hydraulic calculations and flood mitigation measures (specific contents determined after Environment Agency consultation).

  • Flood modelling for the potential risk onsite and offsite, is often included.

 

View Printable FRA Information Sheet PDF
View Printable FRA Schedule PDF 

Feel free to contact our team for an informal discussion.

Tel: 01824 702 220
Email: enquiries@waterco.co.uk

For information on flood risk and PPS25 can be found in Flood Risk Guidance