FRA Screening Study
Purpose
Investigate the flood risk for a development of < 1 ha in EA Flood Zone 1 and provide a written report. This should show that the site has a low risk of flooding from all sources. This is mandatory evidence required for the Code for Sustainable Homes (CSH) Category 4: SUR1 Management of Surface Water Run-off from developments. This also satisfies the requirements of SUR2 Flood Risk to achieve 2 credits.
Items required from client
-
Location plan and site address with post code.
-
Local authority details.
-
Any known contacts with EA, Local Authority and Sewerage Operator.
-
Any planning permission/rejection details relating to flood or drainage issues.
-
Sitecheck, Envirocheck, Homecheck or similar report if available.
|
Included items
-
EA flood map and historical flooding information.
-
Strategic Flood Risk Assessment information.
-
Existing service water drainage information.
-
Review of Sitecheck or Envirocheck report or obtain and review Homecheck Professional Flood Report.
-
Engineering assessment of Flood Risk.
|
Excluded Items
-
EA fees.
-
Sitecheck or Envirocheck or Homecheck Professional Flood report fee.
-
CSH Surface Water Run-off Appraisal.
-
Assessment of Site Drainage Requirements.
-
Service enquiries and investigations.
-
Topographical Survey.
|
View Printable PDF