LATEST NEWS

10-03-2010 - Level 1 FRA Screening Study for CSH
Flood Risk Assessment (FRA) Screening Study as required for Code for Sustainable Homes (CSH) for residential development at a site in Croydon, London, site < 1 ha and not in flood zone. Report will provide mandatory evidence for CSH Category 4: Surface Water Run-off and could achieve the 2 credits available for Sur 2: Flood Risk.
05-03-2010 - FRA Screening Study, Flood Zone 1 < 1ha - Croydon, London
Flood Risk Assessment (FRA) Screening Study as required for Code for Sustainable Homes (CSH) for residential development at a site in Croydon, London, site < 1 ha and not in flood zone. Report will provide mandatory evidence for CSH Category 4: Surface Water Run-off and could achieve the 2 credits available for Sur 2: Flood Risk.

Home > Latest News

Latest News

Level 1 FRA Screening Study for CSH

10-03-2010

Flood Risk Assessment (FRA) Screening Study as required for Code for Sustainable Homes (CSH) for residential development at a site in Croydon, London, site < 1 ha and not in flood zone. Report will provide mandatory evidence for CSH Category 4: Surface Water Run-off and could achieve the 2 credits available for Sur 2: Flood Risk.

FRA Screening Study, Flood Zone 1 < 1ha - Croydon, London

05-03-2010

Flood Risk Assessment (FRA) Screening Study as required for Code for Sustainable Homes (CSH) for residential development at a site in Croydon, London, site < 1 ha and not in flood zone. Report will provide mandatory evidence for CSH Category 4: Surface Water Run-off and could achieve the 2 credits available for Sur 2: Flood Risk.

Flood Risk Assessment - SPP7 Compliant - Dunmore Scotland

04-03-2010

Site for proposed residential development near Dunmore, Arith. Site is shown to lie on the edge of the local SEPA Indicative River and Coastal Flood Map and to be at risk of flooding from the sea under a 0.5% flood event. Planners requested SPP7 compliant FRA. Consideration of both fluvial and coastal flooding required and qualitative appraisal of flood risk at the site. Extent of flooding, potential impacts of development on flood risk elsewhere, access and egress routes, resilience of construction and design of the property itself are all to be considered.

Flood Consequences Assessment (FCA) Flood Zone C1 - South Wales

02-03-2010

Flood Consequences Assessment Report in accordance with TAN 15 for a commercial development in South Wales located within Flood Zone C1. Quantitative appraisal of flood risk posed to site and potential impacts development will have on flood risk elsewhere.

Flood Risk Assessment (FRA), Flood Zone1>1ha - Preston

01-03-2010

Flood Risk Assessment Report in accordance with PPS 25 for proposed residential development in Flood Zone 1>1ha. Qualitative appraisal of flood risk posed to site and potential impacts development will have on flood risk elsewhere. Site is bounded by a number of watercourses and drains, FRA will investigate flood risk from these and check on EA’s easement requirements. Calculate pre and post-development surface water run-off and identify how additional run-off could be dealt with to satisfy Code for Sustainable Homes and Building Regulations.

Preliminary Drainage Assessment for residential development at Northop Hall

25-02-2010

Investigate and advise on available solutions for foul sewage disposal, surface water disposal and access road drainage. Developer Enquiry to DCWW. Includes Flood Risk Assessment (FRA) Screening Study as required for Code for Sustainable Homes (CSH) - site < 1 ha and not in flood zone to achieve up to 2 Sur 2 credits. Reports will provide mandatory evidence for CSH Category 4: Surface Water Run-off and identify how to satisfy mandatory requirements and gain up to 2 Sur 1 credits and 1 Wat 2 credit. Provide budget estimates for foul and surface water detailed design and installation.

FRA Screening Study, Flood Zone 1 < 1ha - Guildford

19-02-2010

Flood Risk Assessment (FRA) Screening Study as required for Code for Sustainable Homes (CSH) for conversion of existing building into residential. Site < 1 ha and not in flood zone. Report will provide mandatory evidence for CSH Category 4: Surface Water Run-off and could achieve the 2 credits available for Sur 2: Flood Risk. Report to also show the site satisfies Sur 1 requirements by default as the site is already connected to the public sewerage network and the development does not increase the impermeable area of the site.

Breach Assessment for new development in Immingham

17-02-2010

Tidal breach assessment for proposed development alongside Humber Estuary involving mapping flood extent and assessing hazard ratings for 10 m grid for 72 hour duration.

Code for Sustainable Homes - Sur 1 Calculations - Gloucestershire

17-02-2010

Proposed residential development of 9 houses on a predominantly Greenfield site. Development will increase the impermeable area of the site. Surface water run-off Rates and Volume calculations in accordance with the Code for Sustainable Homes (CSH) Sur 1 including completion of CSH Sur 1 template.

Flood Risk Assessment (FRA) Scoping Study, Flood Zone 3 - Derby

16-02-2010

Flood Risk Assessment Scoping Study Report in accordance with PPS 25 for boatyard development in Flood Zone 3. Qualitative appraisal of flood risk posed to site and potential impacts development will have on flood risk elsewhere.

Assistance in production of FRA - Great Barr, Birmingham

15-02-2010

Assist in the production of a Level 2 Flood Risk Assessment for a proposed development at Great Barr, Birmingham.

Flood Consequences Assessment (FCA) Scoping Study, Caerphilly

11-02-2010

Flood Consequences Assessment Scoping Study Report in accordance with TAN 15 for proposed residential development not shown on TAN15 flood map, but is shown on EA Flood map. Planning Authority have confirmed they do require a FCA. Qualitative appraisal of flood risk posed to site and potential impacts development will have on flood risk elsewhere.

FRA for a proposed change of use at Old Kent Road, London

05-02-2010

Flood Risk Assessment Scoping Study Flood Zone 3 for a proposed change of use from HMO to 3 separate flats.

Surface Water Drainage Design for Nursing Home extension, Market Drayton

02-02-2010

Surface water drainage design for Nursing Home extension. Client has established that soakaways would not be suitable and that rainwater harvesting will not be used. Waterco to design private surface water sewer, attenuation and discharge control. Confirm with Severn Trent agreement to discharge and complete S106 application.

Flood Risk Assessment - Marina Outdoor Activity Centre, Cheshire

28-01-2010

Flood Risk Assessment in accordance with PPS25 for proposed additional accommodation including boat store and showers/changing rooms. Development is classed as ‘water compatible’. Qualitative appraisal of flood risk posed to site and potential impacts development will have on flood risk elsewhere.

Overland Flood Modelling of River Tees near Cliffe, North Yorkshire

21-01-2010

Overland flow modelling of River Tees flood plain near Cliffe, North Yorkshire using integrated hydrodynamic modelling software, MIKE FLOOD from DHI. Requirement is to position the 1% aep footprint more accurately than can be determined from EA flood map.

Surface water run-off calculations for a site in Theale, Reading

11-01-2010

Provide pre and post development rainfall run-off in accordance with the requirements of the Interim Code of Practice for Sustainable Drainage Systems.

Soakaway Design

07-01-2010

Design of soakaway including the analysis of infiltration test results.

CSH Surface Water run-off appraisal - Rotherwick, Hampshire - Sur1 (Mandatory Requirements) and Sur2

06-01-2010

Provide written report to investigate and advise on the most appropriate surface water drainage solutions and provide a written report. This will identify how the Mandatory Elements of the Code for Sustainable Homes (CSH) Category 4: Surface Water Run-off will be met. Also included is a Flood Risk Assessment Screening Study to assess SUR2 criteria to gain 2 credit for site within flood zone 1.

CSH Surface Water run-off appraisal - Farnham, Surrey - Sur1 (Mandatory Requirements) and Sur2

04-01-2010

Provide written report to investigate and advise on the most appropriate surface water drainage solutions and provide a written report. This will identify how the Mandatory Elements of the Code for Sustainable Homes (CSH) Category 4: Surface Water Run-off will be met. Also included is a Flood Risk Assessment Screening Study to assess SUR2 criteria to gain 2 credit for site within flood zone 1.

CSH Surface Water Run-off Appraisal for residential development in Brighton

16-12-2009

Investigate and advise on available solutions for surface water disposal. Includes Flood Risk Assessment (FRA) Screening Study as required for Code for Sustainable Homes (CSH) - site < 1 ha and not in flood zone to achieve up to 2 Sur 2 credits. Reports will provide mandatory evidence for CSH Category 4: Surface Water Run-off and identify how to satisfy mandatory requirements and gain up to 2 Sur 1 credits and 1 Wat 2 credit.

CSH Surface Water Run-off Appraisal for two residential developments in Kirkby, Liverpool

15-12-2009

Investigate and advise on available solutions for surface water disposal. Includes Flood Risk Assessment (FRA) Screening Study as required for Code for Sustainable Homes (CSH) - site < 1 ha and not in flood zone to achieve up to 2 Sur 2 credits. Reports will provide mandatory evidence for CSH Category 4: Surface Water Run-off and identify how to satisfy mandatory requirements and gain up to 2 Sur 1 credits and 1 Wat 2 credit.

Moston, Manchester - Preliminary Drainage Assessments

11-12-2009

6 separate residential developments proposed in Moston area, Manchester. 2 sites <1Ha so require FRA Screening Studies. 4 sites >1Ha so require FRA reports in accordance with PPS25. This will also satisfy CSH Sur1 and Sur2 assuming that soakaways have been discounted.

Sur1 Template & Surface Water Run-off Calculations - Timperley, Altrincham

09-12-2009

Completion of the Breeam Sur1 Mandatory Requirements Template and associated surface water run-off calculations. To be accompanied by covering letter detailing any additional information and recommendations. Also included is a Level 1 Flood Risk Assessment Screening Study. This FRA will provide the mandatory flood risk evidence required under Sur1 and also evidence for available Sur2 credits.

FRA Screening Study, Rockmount Road, Plumstead, London

08-12-2009

FRA Screening Study Flood Zone 1 < 1ha for a 4 storey block to provide 12 flats (4 x 1-bed, 4 x 2-bed, 4 x 3-bed) at 63-71 Rockmount Road, London, as shown on drawing SP-02. Report will provide mandatory evidence for CSH Category 4: Surface Water Run-off and could achieve the 2 credits available for Sur 2: Flood Risk.

Flood Risk Assessment (FRA) Scoping Study, Flood Zone 3

04-12-2009

Flood Risk Assessment Scoping Study Report in accordance with PPS 25 for proposed change of use of existing film/music recording studio to residential in Flood Zone 3. Modelled flood levels obtained from EA and compared to existing building levels. Qualitative appraisal of flood risk posed to site and potential impacts development will have on flood risk elsewhere.

FRA Screening Study (Sur1 and Sur2) - Site < 1ha - Erith, Kent

04-12-2009

Flood Risk Assessment (FRA) Screening Study as required for Code for Sustainable Homes (CSH) for residential development in Erith, Kent. Site < 1 ha and not in flood zone. Report will provide mandatory evidence for CSH Category 4: Surface Water Run-off (Sur1) and could achieve the 2 credits available for Sur 2: Flood Risk.

FRA Screening Study, Flood Zone 1 < 1ha - in Croydon

02-12-2009

Flood Risk Assessment (FRA) Screening Study as required for Code for Sustainable Homes (CSH). Site < 1 ha and not in flood zone. Report will provide mandatory evidence for CSH Category 4: Surface Water Run-off and could achieve the 2 credits available for Sur 2: Flood Risk.

CSH Surface Water Run-off Appraisal for resedential development in Hartley Wintney, Hampshire

27-11-2009

Investigate and advise on available solutions for surface water disposal. Includes Flood Risk Assessment (FRA) Screening Study as required for Code for Sustainable Homes (CSH) - site < 1 ha and not in flood zone to achieve up to 2 Sur 2 credits. Reports will provide mandatory evidence for CSH Category 4: Surface Water Run-off and identify how to satisfy mandatory requirements and gain up to 2 Sur1 credits and 1 Wat 2 credit.

FRA Screening Study, Flood Zone 1 < 1ha - Kent

26-11-2009

Flood Risk Assessment (FRA) Screening Study as required for Code for Sustainable Homes (CSH) for 5 flats site < 1 ha and not in flood zone. Report will provide mandatory evidence for CSH Category 4: Surface Water Run-off and could achieve the 2 credits available for Sur 2: Flood Risk.

CSH Surface Water Run-off Appraisal in Wysall, Notingham

24-11-2009

Investigate and advise on available solutions for surface water disposal. Includes Flood Risk Assessment (FRA) Screening Study as required for Code for Sustainable Homes (CSH) - site < 1 ha and not in flood zone to achieve up to 2 Sur 2 credits. Reports will provide mandatory evidence for CSH Category 4: Surface Water Run-off and identify how to satisfy mandatory requirements and gain up to 2 Sur 1 credits and 1 Wat 2 credit.

Flood Consequence Assessment, Rossett

16-11-2009

Flood Consequence Assessment in relation to flood risk implications of a caravan site. Site within C2 zone.

CSH Surface Water Run-off Appraisal for detached dwelling on greenfield site, Cumbria

12-11-2009

Investigate and advise on available solutions for surface water disposal. Includes Flood Risk Assessment (FRA) Screening Study as required for Code for Sustainable Homes (CSH) - site < 1 ha and not in flood zone to achieve up to 2 Sur 2 credits. Reports will provide mandatory evidence for CSH Category 4: Surface Water Run-off and identify how to satisfy mandatory requirements and gain up to 2 Sur 1 credits and 1 Wat 2 credit.

Roof and Buildigs reports on water ingress

10-11-2009

preparation of report on condition of Hydro Electric Building at Llyn Celyn. Initial inspections have shown that the roof and certain areas of the walls / windows of the building are leaking badly. Roofing and building contractors have been met on site to put together tenders. Advice and recommendations have been stated in the report issued to DCWW February 2010.

Flood Risk Assessment (FRA) Scoping Study, Flood Zone 3b - Colliers Wood, London

04-11-2009

Flood Risk Assessment Scoping Study Report in accordance with PPS 25 for conversion of a 3 bed ground floor flat into 2 flats: 1 bed and 2 bed in Flood Zone 3b. Qualitative appraisal of flood risk posed to site and potential impacts development will have on flood risk elsewhere.

Flood Modelling & Breach Assessment - Canvey Island

30-10-2009

EA require a site specific breach assessment as the existing SFRA does not take account of climate change. Climate change to be calculated in accordance with PPS 25 on the basis of 50 yr development life. Assess maximum depths, velocities and hazard ratings.

Preliminary Drainage Assessment for 15 homes, Denbighshire

23-10-2009

Investigate and advise on solutions for foul sewage disposal, surface water disposal and access road drainage. Includes Flood Risk Assessment (FRA) Screening Study as required for Code for Sustainable Homes (CSH) - site < 1 ha and not in flood zone. Reports will satisfy mandatory requirements and evidence for CSH Category 4: Surface Water Run-off.

Waterco Release First Issue...

16-10-2009

Waterco Ltd. is proud to announce the release of our Newsletter - Newsplash. To access the newsletter, please follow the Newsletter feed at the top of the page. Alternatively, to download a copy of the newsletter, right click the link and choose download.

Flood Scoping Study - Aberystwyth

15-10-2009

Preliminary Flood Consequeneces Assessment (scoping study) for proposed residential development near Aberystwyth that lies in a C2 flood zone. EA have suggested that the site may not be at risk to the extent suggested by the flood maps. Scoping study to include a levels survey to compare site levels with predicted flood levels.

Flood Consequeces Assessment - Residential development, Swansea

08-10-2009

Flood Consequences Assessment for proposed residential dwelling near Swansea. Site is on boundary of Flood Zone C2. Flood Consequences Assessment Scoping Study to assess actual flood risk-comparison of predicted flood levels with site levels. Consider flood compensation storage.

Flow meter installation at existing STW

02-10-2009

Assessment of flow hydraulics of existing channels to assess the effect of adding a flow meter on the outlet.

Breach Assessment for new development in Immingham

25-09-2009

Tidal breach assessment for proposed development alongside Humber Estuary involving mapping flood extent and assessing hazard ratings for 10 m grid for 72 hour duration.

Flood Risk Assessment-Planning Appeal, Isle of Sheppey

23-09-2009

Flood Risk Assessment to assist with Planning Appeal. Existing holiday chalets on Isle of Sheppey currently have 10 months occupancy under existing planning condition. Proposal is to remove planning condition to allow 12month occupancy. Site is at risk from tidal flooding. Flood Risk Assessment to show increasing occupancy would not increase flood risk as chalets already occupied during months with higest tidal flood risk.

Flood Risk Assessment-Proposed Community Home

22-09-2009

Flood Risk Assessment for proposed re-development of community home. Site is not in a flood zone, but is greater than 1 Ha. Therefore Flood Risk Assessment required to satisfy PPS25 including: Assessment of all sources of flooding, pre and post-development surface water run-off calculations and an assessment of overland flow.

Surface Water Run-off Appraisal - Gaerwen, Anglesey

21-09-2009

Surface Water Run-off appraisial to satisfy SUR1 of the Code for Sustainable Homes. It will investigate and advise on the most appropriate surface water drainage solutions for the site including pre and post development runoff calculations. Report to also advise on the requirement for rainwater harvesting and attenuation.

Breach assessment to determine options for development in Cwmbran

10-09-2009

Zone C2 protected by railway embankment. Detailed breach and overtopping assessment to determine flood depths velocities and options for regeneration.

Flood consequence assessment for proposed development Kidwelly

02-09-2009

Flood Consequences Assessment for an outline planning application for a 3G sports pitch and associated car park located in Kidwelly. Site is within a C1 flood zone at risk of tidal and fluvial flooding. The FCA is in accordance with TAN 15 and has been undertaken for the Town Council.

Flood risk assessment for housing on edge of zone 3

25-08-2009

New development proposed alongsided flood zone 3. River modelling to determine flood levels in greater detail to assess risk and advise on Finished floor level.

CSH Surface Water Run-off Appraisal (Sur1 and Sur2) and Flood Risk Assessment - Heywood, Lancashire

24-08-2009

Investigate and advise on the most appropriate surface water drainage solutions and provide a written report. This identifies how the Mandatory Elements of the Code for Sustainable Homes (CSH) Category 4: Surface Water Run-off will be achieved and how to gain up to 2 SUR1 credits and 1 WAT2 credit. Level 1 Flood Risk Assessment also included to assess SUR2 criteria to gain 2 credits for site within flood zone 1.

Surface Water Run-off Appraisal, Industrial development, Huyton

19-08-2009

Proposed industrial development at Huyton. Development will involve replacing existing grassed areas with hardstanding. The EA require that there are no significant changes to site that would increase flood risk. Surface water run-off calculations to assess pre and post development run-off. Surface water run-off appraisal including recommendations to deal with surface water run-off.

Water mains replacement WIRS - Sudbrook

18-08-2009

Waterco to liaise with client contractor and utility to transfer of private water supplies to the local utility mains. Scheme design and drawings in accordance with Water Industry Registration Scheme. Review Completion of utility Applications Packs. 3rd party land crossings & environmental issues. Liaise with Fire Service regarding fire hydrant requirements.

Flood Consequence Assessment for conversion of property in Beddgelert

17-08-2009

Flood Consequence Assessment in accordance with TAN15 - site in zone C1, EA have carried out no hydraulic modelling therefore no flood levels available. Hydraulic modelling to determine predicted flood and to enable a comparison with building floor levels.

Flood Consequence Assessment for conversion of property in Beddgelert

17-08-2009

Flood Consequence Assessment in accordance with TAN15 - site in zone C1, EA have carried out no hydraulic modelling therefore no flood levels available. Hydraulic modelling to determine predicted flood and to enable a comparison with building floor levels.

CSH Surface Water Run-off Appraisal, 14 terraced houses on brownfield site - Wirral

12-08-2009

Investigate and advise on available solutions for surface water disposal. Includes Flood Risk Assessment (FRA) Screening Study as required for Code for Sustainable Homes (CSH) - site not in flood zone, to achieve up to 2 Sur 2 credits. Reports will provide mandatory evidence for CSH Category 4: Surface Water Run-off and identify how to satisfy mandatory requirements and gain up to 2 Sur 1 credits and 1 Wat 2 credit.

Code for Sustainable Homes SUR1 - Haywood

11-08-2009

Code for Sustainable Homes SUR1 Surface Water Run-off Appraisal for redevelopment in Heywood - Investigate and advise on the most appropriate surface water drainage solutions and provide a written report. This will identify how the Mandatory Elements of the Code for Sustainable Homes (CSH) Category 4: Surface Water Run-off will be achieved and how to gain up to 2 SUR1 credits and 1 WAT2 credit. Level 1 Flood Risk Assessment also included to assess SUR2 criteria to gain 2 credits for site within flood zone 1.

Flood risk assessment for new housing development Croydon

10-08-2009

Preliminary Flood Risk Assessment (PFRA) for proposed pair of semi detached dwellings. PFRA to advise on likely outcome of full FRA but may prove sufficient to satisfy EA. Site appears on the current EA map as being in Flood Zone 3. Potential flooding from culverted River Wandle. Overland flow needs to be considered.

Code for Sustainable Homes SUR1 - Gravesend

03-08-2009

Code for Sustainable Homes Surface Water Run-off Appraisal - his will identify how the Mandatory Elements of the Code for Sustainable Homes (CSH) Category 4: Surface Water Run-off will be achieved and how to gain up to 2 SUR1 credits and 1 WAT2 credit. Investigate and advise on the most appropriate surface water drainage solutions. Flood Risk Assessment satisfying requirements of CSH to assess SUR2 criteria to gain 1 credit for site within flood zone 3a.

Standard Detail Drawings for Water Meter Installations

29-07-2009

Provision of standard details for use in the installation and improvement of private water services for a major landowner.

FRA - Screening Study for the Code for Sustainable Homes, London

14-07-2009

Report showing the site is in Flood Zone 1 and has a low risk of flooding from all sources. This satisfies mandatory requirements of the Code for Sustainable Homes (CSH) and shows that the development qualifies for 2 credits for SUR2 Flood Risk.

Pipeline upgrade in nothwest Wales

07-07-2009

Land ownership details, route plans materials scheduling and connection details for replacement pipeline

Greenfield run-off calculations, Bedfordshire

15-06-2009

Greenfield run-off calculations for quarry extension

Water Mains Initial Bid Design, Norfolk

11-06-2009

Water mains initial scheme layout/ schedule for the purpose of budget and pricing, for Self-Lay Organisation for new development of 29 houses.

Flood risk assessment for proposed housing development in Warrington

10-06-2009

Flood risk assessment for proposed housing development in Warrington on the edge of the zone 3 flood plain. Possible opportunity to regrade the land and provide flood plain compensation to achieve a better housing layout.

Construction Quality Assurance Validation Report, Shropshire

08-06-2009

CQA validation report for a waste handling site

Soakaway design for 4 terraced houses in conjunction with rainwater harvesting

22-05-2009

Calculations for submission to Building Control/ agents. Layout sketch showing size, location and details of soakaway.

Establish drainage principles to satisfy Planning Authority for redevelopment, Flintshire

13-05-2009

Consultation with Planning Authority and others to agree the principles of highway and drainage design and demonstrate drainage solutions are achievable to satisfy requirements to obtain planning permission for 15 houses on brownfield site.

Flood consequences assessment for residential development, Connahs Quay.

06-05-2009

preparing flood consequences assessment in accordance with TAN15 for proposed housing development shown on the DA Map as being at risk of tidal and fluvial flooding. Works to include breach and overtopping assessment

Flood risk assessment for proposed agricultural development, Herefordshire

06-05-2009

preparation of flood risk assessment in accordance with PPS25 as the development land is zone 3. Also before and after run off assessment

Flood Consequence Assessment, Rossett

24-04-2009

Flood Consequence Assessment in relation to flood risk implications of a caravan site. Site within C2 zone. Review of Lidar data and site levels.

Water main design, Fleetwood

24-04-2009

Design of new water main compliant with UU requirements and WIRS standards for small residential development.

Potable water pipeline replacement scheme, near Corwen

22-04-2009

land plans, long section, layout plans and connection details for replacement water main

Potable water pipeline replacement scheme, Dolgellau

22-04-2009

land plans, long section, layout plans and connection details for replacement water main

Flood consequences assessment for fish pond development, Wrexham

20-04-2009

preparing flood consequences assessment in accordance with TAN15 for series of ponds - not on flood plain. Before and after run off assessments required by EA to ensure no detrimental impact elsewhere

Flood consequences assessment for new apartment block development, Deeside

15-04-2009

breach and overtopping assessment of River Dee defences and preparing flood consequences assessment in accordance with TAN15. flood modelling utilising Mike 21 and Mikeflood

Wastewater treatment works inlet channel refurbishment, Whitchurch

10-04-2009

Hydraulic assessment of existing and future flows and providing advice on appropriate weir and overflow settings

Flood risk assessment for proposed agricultural development, Cricklade

03-04-2009

preparation of flood risk assessment in accordance with PPS25 as the development land, although zone 1, is greater than 1 ha. Before and after run off assessment

Flood Risk Assessment for new property in Merseyside

01-04-2009

preparation of flood risk assessment in accordance with PPS25 for the redevelopment of a site in zone 3

Flood consequences assessment for redevelopment, Glyndyfrdwy

10-03-2009

preparing flood consequences assessment in accordance with TAN15 for residential redevelopment of site shown on the DA Map as zone C2. works to include river modelling using Mike flood

Preliminary Flood Consequence Assessment for conversion of a chapel to residential accommodation

25-02-2009

Chapel in Mid Wales shown to be in a C2 zone. Preliminary assessment to advise client on likely outcome of a full Flood Consequence Assessment.

River bank erosion assessment, Caergwrle

18-02-2009

Inspection and report on river bank erosion - following partial blockage of flow by fallen trees

Flood Consequence Assessment (including Breach Assessment) for residential extension to hotel

17-02-2009

Hotel in North Wales looking to add further bedrooms. Site is in a C1 area behind flood defences. Flood Consequence Assessment to investigate possible overtopping and consequences of a breach in the defences.

Sewer Flooding Investigation, Egham

16-02-2009

Inspection and investigation of basement flooding during heavy rainfall. Providing advice on mitigation measures including installation of non-return valves on sewer system

Detailed drainage design for 3 houses to highest Code for Sustainable Homes

10-02-2009

Detailed design for surface water cut-off drain and soakaway and foul sewer for adoption, following successful stage 1 - preliminary drainage assessment and planning permission.

Design of replacement water main for Dwr Cymru Welsh Water

09-02-2009

Rural Gwynedd. Approximately 1.5Km of existing 2” AC main that has been subject to numerous bursts is to replaced. Waterco to determine design and layout and liaise with contractor, Environment Agency, landowners and various environmental bodies.

Flood Risk Assessment for commercial development in Uxbridge

16-01-2009

Flood Risk Asssessment for the redevelopment of a commercial site. The site is not in the flood plain, however is surrounded by an area designated as zone 3 on the EA flood maps, therefore on a ‘dry island’. Preparation of a FRA has been undertaken in accordance with PPS25.

Flood Consequence Assessment for proposed redevelopment near Corwen

17-12-2008

Preliminary Flood Consequences Assessment for a redevelopment in a C2 flood zone. Including flow assessment, hydraulic calculations and appraisal of the site. Discussions with the Environment Agency to establish full FCA criteria in accordance with TAN 15.

Design support and flood consequences assessment, Mid Wales

15-12-2008

Flood Consequences Assessment in accordance with TAN 15 for an extension to existing car park and riverside amenity area. Land is on the flood plain and is subject to yearly flooding. Pond and surface water drainage design support to the landscape designer has also been provided.

Combined Sewer Overflow improvement projects in the Northwest

02-12-2008

Complete tender documents and drawings for 4 combined sewer overflow improved schemes

Flood Risk Assessments for new developments on leisure complex, Lancashire

19-11-2008

Flood Risk Assessment for a number of new developments on an area designated as zone 3 on the EA flood maps. Preparation of FRA in accordance with PPS25 and supporting applicant during planning appeal and public enquiry

Flood Consequences Assessment in Kidwelly

13-11-2008

Flood Consequences Assessment for temporary office portacabins to be located in Kidwelly. Site is within a C1 and C2 flood zone at risk of tidal and fluvial flooding. The FCA is in accordance with TAN 15 and has been undertaken for the Town Council.

Replacement water main near Bangor

23-10-2008

Route appraisal and design of 2km of new 225 mm hdpe water main to replace existing raw water main from reservoir to treatment works. Existing main runs through SSSI new main to be relocated in roadway.

Replacement water main near Bangor

23-10-2008

Second phase. Route appraisal and design of 2km of new 225mm hdpe water main to replace existing raw water main from reservoir to treatment works. Existing main runs through SSSI new main to be relocated in roadway.

Flood Consequence Assessment for storage depot in Mold

22-10-2008

Flood consequence assessment TAN15 for a proposed container storage depot in zone C2 with special consideration of surface water run off affects

Flood Risk Assessment for housing development in St Helens

17-10-2008

Flood risk assessment PPS25 for large development area on former industrial land with particular requirement to consider effect on surface water runoff and overland flow due to culvert blockages and sewers.

Asset assessment for water company Capital Investment Planning

06-10-2008

Extension of earlier commission to categorise assets, determine budget costings and identify expenditure required for next Capital programme.

Preliminary Consequence Assessment, Bangor on Dee

02-10-2008

Not on flood map, but in flood risk area

Pipeline replacement, St Asaph

23-09-2008

Appointed to supervise construction of 8 km of new 500 mm pipeline to replace an existing trunk main which is giving repeated burst problems.

Flood Consequence Assessment for storage depot in Mold

22-09-2008

Flood consequence assessment TAN15 for a proposed container storage depot in zone C2

Flood consequence assessment, Rhyl

19-09-2008

Flood consequence assessment TAN15 report in accordance with TAN15 for conversion of existing bulding into apartments

Water main design, Nr. Wigan

12-09-2008

Design of new water main compliant with UU requirements and WIRS standards for small housing development in Standish

Water main design, Chorley

12-09-2008

Design of new water main compliant with UU requirements and WIRS standards for small commercial development in Standish

Water main design, Fleetwood

12-09-2008

Design of new water main compliant with UU requirements and WIRS standards for small residential development in Standish

Preliminary Flood Risk Assessment, Norfolk

01-09-2008

Preliminary Flood Risk Assessment for the proposed conversion of existing listed building into 8 residential dwellings. Site is within Flood Zones 2 + 3.

Flood Risk Assessment , Staffordshire

25-08-2008

Flood Risk Assessment PPS25 in relation to a proposed replacement residential dwelling within the River Avon floodplain.

Flood risk assessment, DPZ Corwen

23-08-2008

Flood risk assessment PPS25 for commercial premises in Corwen which lies within the Dee Protection Zone. Particular consideration to be given to the contamination risk arising from water used in extinguishing a fire flowing to the river.

Pipeline replacement scheme, Bala

18-08-2008

Replacement of 3.5km of existing 7” asbestos main with new 250 mm pe pipeline alongside

Detailed drainage design, Llanidloes

14-08-2008

Detailed drainage design for small housing development near Llanidloes on greenfield site. Offsite attenuation pond proposed to obviate onsite storage.

Soakaway Design, Hook, Hampshire

04-08-2008

Soakaway design for new commercial premises - residential home - existing soakaway at capacity. design includes attenuation pond due to relatively low permeability value and requirement to deal with surface water as well as foul flows.

Groundwater monitoring

28-07-2008

Re-appointed by Network Rail for a further 12 months of ground water monitoring of underground rail system.

Asset assessment for water company Capital Investment Planning

28-07-2008

Extension of earlier commission to categorising assets and identifying expenditure required for next Capital programme.

Flood Risk Assessment , Hertfordshire

21-07-2008

Flood Risk Assessment PPS25 required for a proposed residential development site located in Flood Zone 2. Flood Risk Assessment to determine flooding across the site and whether the depths of development proposal is acceptable according to PPS25.

Preliminary Flood consequence assessment, Colwyn Bay

21-07-2008

Preliminary Flood Consequence Assessment in relation to a proposed residential development in a C2 zone.

Flood Risk Assessment for brownfield site, Ellesmere Port

14-07-2008

Flood Risk Assessment PPS25 for redevelopment of a brownfield site within Flood Zone 1 area greater than k hectare. Flood Risk Assessment report required to satisfy PPS 25 + SUDS guidelines.

Flood Consequence Assessment, Rhyl

14-07-2008

Flood Consequence Assessment TAN15 for proposed development of 9 flats in a C1 zone.

Drainage assessment, Gwernymynydd

14-07-2008

Drainage Assessment including a brief Flood Risk Assessment for 3 new build 4/5 bedroomed houses on brownfield site. The houses are to achieve Code 6 for Sustainable Homes.

Drainage assessment, nr Corwen

13-07-2008

Concept design for foul and surface water drainage disposal associated a new industrial complex on a brownfield site

Replacement water pipeline, Anglesey

26-06-2008

Land ownership enquiries, route appraisal and design for the renewal of approximately 12km of pipeline involving directional drilling

Flood Risk Assessment for improvements to sports facilities, St Helens

23-06-2008

Flood Risk Assessment PPS25 required for changes to an existing sports facility including the conversion of grass pitches to 3G synthetic material. Site within flood zones 2 & 3.

Preliminary Flood Consequence Assessment, Rossett

23-06-2008

Flood Consequence Assessment in relation to flood risk implications of a caravan site. Site within C2 zone.

Preliminary flood risk assessment, commercial development, Preston

10-06-2008

Proposed residential caravans with commercial site use, on land with existing planning permission, but shown as zone 3. Preliminary assessment to determine likelihood of a positive FRA

Renewal of air valves on existing water main, St Asaph

29-05-2008

Land ownership enquiries and negotiations for the renewal of air valves on existing water main.

Flood Risk Assessment, Crewe

22-05-2008

Flood Risk Assessment PPS25 to model the 100 year fluvial flood level for a site adjacent to Valley Brook, Crewe to assist the developer in determining a safe finished floor level.

Flood Consequence Assessment, Prestatyn

20-05-2008

Flood Consequence Assessment TAN15 for proposed development of bungalow property on an area shown on flood map as C1.

Replacement water pipeline, Bala

13-05-2008

Route appraisal and design for the renewal of approximately 2km of pipeline using pipe bursting techniques

Contingency plans for Water Treatment Works

08-05-2008

Reviewing and updating existing Total Loss Contingency Plans for 19 Water Treatment Works and preparing new plans for 8 Water Treatment Works.

Preliminary Flood Consequence Assessment, Rhyl

06-05-2008

Preliminary assessment to advise on the likely outcome of a full Flood Consequence Assessment for conversion of an existing property into flats

Preliminary Flood Consequence Assessment, Llansannan

01-05-2008

Single residential development in zone C2 - annex to existing building.

Soakaway design, Barmouth

30-04-2008

Design of private soakaways for houses and road on new development site

Asset assessment for water company Capital Investment Planning

28-04-2008

Categorising assets and identifying expenditure required for next Capital programme.

Flood Consequence Assessment, West Shore Llandudno

22-04-2008

Flood Consequence Assessment TAN15 for proposed conversion and extension of existing property to create 3 additional apartments; shown on flood map as C1.

Preliminary Drainage Assessment, Rhewl

16-04-2008

Establish drainage solutions in principle for foul, surface water and road drainage for 8 house development

Preliminary FRA, Twickenham

16-04-2008

Preliminary Flood Risk Assessment for proposed conversion of existing dwelling to two flats in an areas shown as flood zone 3 on the Environment Agency flood map

Soakaway Design, Hook, Hampshire

11-04-2008

Soakaway design for new commercial premises - residential home - existing soakaway at capacity. design includes attenuation pond due to relatively low permeability value and requirement to deal with surface water as well as foul flows.

Flood Consequence Assessment, Gaerwen Anglesey

08-04-2008

Flood Consequence Assessment TAN15 for proposed medical health centre and housing development on brownfield site.

Soakaway Design in Hook, Hampshire

08-04-2008

Soakaway design for new commercial premises - residential home - existing soakaway at capacity. design includes attenuation pond due to relatively low permeability value and requirement to deal with surface water as well as foul.

Preliminary Flood Risk Assessment, Alrewas, Staffordshire

07-04-2008

Preliminary FCA for new residential property in flood zone 2

Detailed Drainage Design, Rhos-on-Sea

04-04-2008

Design of Private drainage and sewers for adoption for foul and surface water for 8 apartments on greenfield site.

Leighton Buzzard - flood risk and hydrological assessment

24-03-2008

Assessment to review existing surface water features to determine any problematic areas that may impact on development. Investigation of flood risk as adjacent watercourses appear to show site potentially at risk, consultations with EA, LA drainage dept. and local research.

Leighton Buzzard - flood risk and hydrological assessment

14-03-2008

Assessment to review existing surface water features to determine any problematic areas that may impact on development. Investigation of flood risk as adjacent watercourses appear to show site potentially at risk, consultations with EA, LA drainage dept. and local research.

Preliminary Flood Consequence Assessment, Ruabon

11-03-2008

Proposed to build 4 houses on an area shown on the flood map as zone C2. Discussions with EA and planning as the map appears to be wrong and the map incorrectly designated as at risk

Ammanford - Preliminary Flood Risk Assessment

05-03-2008

Proposed housing development on land between two streams. Shown as being zone C2 but there is an existing wall which appears to act as a flood defence. Investigations to determine whether site can be developed.

Preliminary Flood Consequence Assessment, Flint

04-03-2008

Strip of land alongside the Swinchiard Brook shown on the flood map as partly zone C2 - fluvial. Question is where the boundary lies - some modelling will probably be necessary to identify a safe development boundary.

Preliminary Flood Consequence Assessment, Neath

28-02-2008

Proposed residential development on land shown to be zone C2 - fluvial. Flood map could be incorrect as preliminary comparison between LIDAR data and indicative flood flows appears to shows a safe margin between predicted flood level and digital ground levels.

Pipeline replacement, St Asaph

20-02-2008

8 km of new 500 mm pipeline to replace an existing trunk main which is giving repeated burst problems. Works to include obtaining land owner information and preparing notice plans. Route appraisal, topo survey, sections, construction details and thrust blocks as necessary.

Mostyn - Preliminary Flood Risk Assessment

08-02-2008

Proposed residential development on existing commercial premises. Site shown to be at C1 flood risk - tidal with coastal defences. Assessment indicates there is no fluvial risk - so no loss of flood plain if land is raised. Simplest solution is therefore to raise the land above tidal flood risk level.

Flood Risk Assessment, Talysarn, Penygroes

04-02-2008

Flood risk assessment PPS25 for existing quarry waste tip alongside river. Waste to be removed to allow car parking facility and amenity area to be constructed . Site not currently shown to be at risk of flood, but removal of waste will lower site levels, it must therefore be shown that the new level will be safe for the amenity site and also will not worsen the situation elsewhere.

Flood Consequence Assessment, Kinmel Bay

15-01-2008

Flood Consequence Assessment TAN15. Proposed to replace an existing bungalow with a house. Should reduce risk therefore only a limited assessment is required to satisfy the planning authority that the TAN 15 rules are complied with by the new development with no additional risk to neighbouring properties.

Preliminary Flood Consequence Assessment, Caerwys

09-01-2008

Proposed residential development on former commercial land. Land shown to be zone C1 and protected by existing defences. However latest EA predicted flood levels indicate that a railway embankment which presently protects the site from upstream overland flows could now be overtopped and flood into the defended area. Question is whether the land constitute loss of flood plain if it is supposed to be protected.

Preliminary Flood Consequence Assessment, Llangammarch

04-01-2008

Proposed residential development in zone C2 undefended. Formerly a building on the site and no history of flooding, but current EA flood map predictions suggest otherwise and planning permission is therefore likely to be refused. However mapping could be wrong as topo levels indicate the site is above the EA predicted flood levels.

Hydro Assessment Quarry Extension, Bolton

27-12-2007

Hydrological Assessment for potential quarry extension. Assessment of flood risk to adjacent properties and consideration of surface water disposal options for works

Soakaway Design in Hook, Hampshire

14-12-2007

Soakaway design for new commercial premises - residential home - existing soakaway at capacity. design includes attenuation pond due to relatively low permeablility value and requirement to deal with surface water as well as foul.

Preliminary flood risk assessment - Barmouth

03-12-2007

Preliminary flood risk assessment for new housing development near coast zone C1

Preliminary flood risk assessment - Beddgelert

20-11-2007

Preliminary flood risk assessment for conversion of commercial premises to holiday accommodation in zone C1

River Modelling - Welshpool

19-11-2007

Conversion of commercial premises to residential development alongside river in zone C2. Flood consequence assessment appropriate due to existing planning approval. Historical research to be followed by river modelling to determine flood levels.

School extension FRA, Southwark

22-10-2007

Refurbishment and extension of school part zone 2 and part zone 3 first stage flood risk assessment - preliminary appraisal to obtain EA information review the architectural details available and provide an initial view on whether a full assessment is justified.

Private water supply upgrade, Flintshire

18-10-2007

Prepare details of scheme and obtain DCWW approval to adoption standard. Prepare tender documents and obtain competitive quotations from select list of DCWW approved contractors.

Flood Consequence Assessment, Pwllhelli

16-10-2007

Flood consequence assessment report in accordance with TAN15 for a Brownfield site in a Flood Zone C1. FCA report required to determine whether more land should be suitable for development than presently indicated on flood map.

Berryscaur River Model

04-10-2007

Commissioned to undertake additional river modelling in Berryscaur, Scotland to recommend floor levels for new development. In accordance with SEPA requirements the rainfall runoff method (not revitalised) is to be used for the 1 in 200 yr flood flow prediction.

Preliminary FRA, Shepperton

03-10-2007

Preliminary flood risk appraisal for new residential (infill) development in zone 3. EA have advised a specific flood level and asked for consideration to be given to access and egress routes, if the proposed dwelling level is above the quoted flood level.

Private Waste Water Treatment Works, Anglesey

25-09-2007

Refurbishment and extension of existing nursing home. Septic tank to be replaced with new private wastewater treatment works to cater for increase flow and also improve discharge quality. Determination of the WwTW requirements; obtaining approval from EA and advising on quotes from specialist suppliers, with particular emphasis on the future power and maintenance costs.

Flood Risk Assessment, Halifax

12-09-2007

Redevelopment of former brewery site. FRA required by Planning Authority. Particular consideration to be given to overland and offsite flood flows.

Flood Risk Assessment for Commercial development in Ambleside

10-09-2007

Flood Risk Assessment PPS25 Zone 1 - so no significant flood risk to site, but as development exceeds 1 hectare FRA is required under PPS25 to check effect of SW runoff on other land downstream

Housing Development - Ewloe, Flintshire

10-09-2007

Appointed to prepare Flood Consequence Assessment for new residential development near A55 interchange. Spill from nearby watercourse to be considered together with overland flow from surface water run off

Extension to existing building near Welshpool

03-09-2007

TAN 15 Zone C2 - Flood consequence assessment for extension under clause 11.19

Flood Risk Assessment, Land alongside River Severn

17-08-2007

Preliminary Flood Risk Assessment to investigate the flood risk to a strip of land alongside the River Severn in Newtown. Proposal is to build 5 new dwellings but land is classified zone C2. Topo survey suggests zone may be wrong and flood map could be challenged.

Preliminary Flood Risk Assessment, Rhydymwyn

14-08-2007

Village has recently had flood defence works installed so the investigation brief is to determine whether the zone classification (currently C2) could be altered in which case an FCA may be appropriate.

Preliminary Drainage Assessment former Textile Mill

07-08-2007

Mixed development proposed on brownfield site. Investigate foul and surface water solutions for site

Preliminary Drainage Assessment, Holywell

06-08-2007

Proposed to build 50 houses on greenfield site. Provide evidence of drainage solutions available. Percolation tests required to investigate SUDS options.

Preliminary Drainage Appraisal Bodfari, Flintshire

01-08-2007

Proposed to build 9 new houses on greenfield site. Investigate foul and sw solutions and outline the options available.

Flood Risk Assessment, Holmes Chapel

30-07-2007

Flood Risk Assessment PPS25 Brownfield site extending to 4.25ha. Flood zone 1, but PPS25 requirement to identify any impact of development on flood risk areas downstream.

Foul sewage flooding, Reading

21-07-2007

Investigation of foul sewage flooding of property - possibly due to problems with nearby pumping station or overloaded sewerage system

Flood Consequence Assessment, Porthmadog

17-07-2007

Flood Consequence Assessment PPS25 FCA for redevelopment of former boat yard in Zone C1 including construction of new commercial facility.

Private Water Main Investigation, Flintshire

21-06-2007

Inspection, investigation and hydraulic calculations for private water supply to 40 domestic properties, where pressure and supply problems are occurring.

Total Loss Contingency Plans

16-06-2007

Update of strategic plans for various water treatment works

Flood risk assessment, Hammersmith

11-06-2007

Flood Risk Assessment PPS25 for conversion and extension of existing commercial property to residential use.

Preliminary Flood Risk Assessment, Ewloe

06-06-2007

Preliminary Flood Risk Assessment for potential development land shown as zone C2 on the flood map

Flood consequences assessment for property in Connah’s Quay

05-06-2007

Flood Consequence Assessment TAN15 Proposed housing development on vacant brownfield site in zone c1. FCA to consider the risk from breach of the River Dee defences.

Flood consequences assessment for property in Rhyl

16-05-2007

Flood Consequence Assessment TAN15 Conversion of former offices to two storey residential accommodation in zone c1. Level survey to check flood risk from tidal inundation due to breach of sea defences.

Flood consequences assessment for property in Bala

15-05-2007

Flood Consequence Assessment TAN15 Conversion of former bakery to two storey residential accommodation in zone c1. Level survey to check flood risk against impounded water level in Bala lake

Breach assessment ,Deeside

10-05-2007

Breach assessment associated with a number of new residential developments in Deeside. Lidar data is to be obtained from EA and the effect of a breach in the River Dee defences simulated using MIKE 21 flood modelling software. Liaise wth EA over the requirements and submit model report for approval.

Flood risk assessment for residential development near Welshpool

06-05-2007

Flood Risk Assessment PPS25 Conversion of commercial premises to residential development alongside river in zone C2. Flood consequence assessment appropriate due to existing planning approval. Historical research to be followed by river modelling to determine flood levels

Flood Risk Assessment for commercial development in Anglesey

24-04-2007

Flood Risk Assessment PPS25 Existing commercial development near Parys Mountain. Improvements to watercourse have been carried out by site owner following recent flooding. Planning application for extension to unit requires FCA. Assessment to include review of river modelling - section 105 report.

Property extension in Llanfihangel - zone C2

24-04-2007

Satisfied planning authority that due to the size of the extension and location of the property in relation to the flood zone the additional flood risk was minimal and no full assessment was required

FCA for hotel extension and apartment block ,Queensferry

19-04-2007

zone C1 - part commercial part residential. Flood Consequence Assessment to consider breach of tidal River Dee defences and also fluvial flooding from nearby drainage channels

Extension to caravan park in Anglesey.

13-04-2007

Zone C2 - preliminary assessment to determine viability of full assessment.

Proposed new house in Prestatyn.

05-04-2007

Zone C1 - Flood Consequence Assessment to consider both tidal and fluvial risk.

Pipeline diversion Mochdre

29-03-2007

Thrust block and anchor block design for 350 mm iron pipeline diversion around proposed commercial development including tie in details.

Pipeline Diversion St Asaph

19-03-2007

Details for 500 mm pipeline diversion around proposed development near St Asaph including thrust block and tie in details, land plans and service enquiries.

Flood risk assessment for new holiday lodge development in Worcestershire.

19-03-2007

Flood Risk Assessment PPS25 Part of development in zone 2 part zone 3. Assessment to address EA concern over additional storm water runoff.

Rhyl property conversion FCA

13-03-2007

Existing property in Rhyl zone C1 on seafront. Proposed conversion to apartments. Flood Consequence Assessment to consider availability of safe escape routes

Extension to house alongside River Test , Hampshire

09-03-2007

EA have requested a full risk assessment and suggested the need for river modelling. Requirement to be challenged due to scale of development

Drainage advice - Rhos on Sea

05-03-2007

Proposed residential development in Rhos on Sea. Advising on foul and surface water disposal where site is landlocked by third party land

Tattershall FRA

01-03-2007

New residential development in zone 1 but identified on local Strategic FRA as high risk. Preliminary flood risk appraisal to advise developer.

Shackerley Manchester FRA

24-02-2007

Site not in flood risk zone (zone 1) but FRA suggested by Planning Authority. Discussion and agreement of EA requirements.

United Utilities Amp 4 programme

23-02-2007

Appointed by MWH to assist on the UU Amp 4 programme reviewing the options available for dealing with a number of UIDs in North West.

Berryscaur FRA

05-02-2007

Preliminary river modelling for housing development alongside Dryfe Water to enable SEPA to consider the flood risk. No flood maps available.

Preliminary Drainage Appraisal

25-01-2007

Preliminary assessment and detailed design of foul and sw drainage systems for new housing development near Holywell.

Dee Tunnel Inspection

24-01-2007

Visual condition inspection of access tunnel under River Dee successfully completed

Preliminary Drainage Appraisal

21-01-2007

Preliminary assessment and detailed design of foul and sw drainage systems for new housing development near Bagillt.

Preliminary Drainage Assessment - Llandudno

17-01-2007

Proposed 44 apartments and 4 offices on former garage and car park site. Consideration to be given to rainwater recycling to limit runoff.

Flood Risk Assessment near Lattersley

12-01-2007

Flood risk assessment PPS25 for area of raised land to determine consequential effect on surrounding land in Fens.

Hydrology Assessment - Alsager

10-01-2007

Proposed aggregate recycling operation in existing quarry situated near Alsager - preparation of hydrology chapter for inclusion in Environmental Statement.

Drainage design for new housing development

20-12-2006

Preliminary assessment and detailed design of foul and sw drainage systems for new housing development near Flint.

Reservoir Outlet Meter

18-12-2006

Preparing pipework and support details for 600 mm magflow meter on reservoir outlet for United Utilities OS.

Flood Risk Assessment for housing development

12-12-2006

Flood Risk Assessment PPS25 Assessing and reporting on the risk to a 15 house development on the edge of the flood map - zone C2.

Ashgrove Water Treatment Works Remedials

10-12-2006

Investigation of problems with screens and troughs, preparation of details and specification for remedials and obtaining quotes.

Post tensioned concrete tank - internal inspection

05-12-2006

Underwater camera inspection to provide information for structural assessment of tank and options for remedial works.

Judicial Review of Planning Decision

01-12-2006

Providing independent expert advice on drainage design and associated flood storage provision

Tunnel Inspection for United Utilities

10-11-2006

Inspection of strategic water mains in tunnel under river for UUOS in order to determine condition and provide advice on risk management and contingency plans

Assessment of foul sewage disposal options

06-11-2006

Investigation of existing system on former RAF base where new residential development is proposed. Considering options for new private waste water treatment plant and the constraints involved in connecting to foul sewer system.

Trunk main valve installations

02-11-2006

Planning and design of 2 new isolating valves on 27" AC main for United Utilities; including land plans pipework and thrust wall details.

Investigation of past flooding in Beaumaris

24-10-2006

Investigating past flooding incident on behalf of individual householder to determine whether recent works by the local authority have alleviated the flood risk.

TAN 15 zone B - commercial development FRA

18-10-2006

Extension to existing building. Checking levels and escape routes as part of flood risk assessment for site owner in support of planning application

TAN 15 zone C1 - power plant

18-10-2006

Preparation of flood risk assessment on behalf of developer to support planning application.

TAN 15 zone c2 commercial development

18-10-2006

Assessment of consequences of flooding for new commercial development near existing quarry. River modelling, flood risk assessment and advising on floor levels and access.

Abandoned culvert - Dudden Hill London

13-10-2006

Investigation on behalf of potential purchaser of land to determine whether culvert had been abandoned and viability of development. Culvert found to still exist and other major drains and sewers were also present.

Breach Assessment, Deeside

09-10-2006

Office development in Shotton Deeside. Zone C1 tidal. Appointed to undertake breach assessment for River Dee.

Mike User Group Meeting

15-09-2006

Waterco Ltd. attended the UGM to learn about the new features of Mike 11, Mike 21, Mike Urban and Mike Flood.

Storm Water Attenuation

10-09-2006

Attenuation pond volume assessment for new power plant development in South Wales

AMP4 STW Improvements

16-08-2006

Assisting MWH with preliminary assessment of STW improvement works in Northeast England.

Culvert Condition Assessment

08-08-2006

Preliminary assessment of culvert beneath proposed development site in Edgeware, London.

Quality System Audit

22-07-2006

Annual surveillance audit carried out by Isoqar. As a result our registration has been continued. This shows that our system has been approved to ISO 9001: 2000.

Llanystumdwy

20-07-2006

Flood Consequence Assessment for industrial development partially in Zone C2.

Denbighshire

12-07-2006

Appraisal of private Effluent Treatment Plant Performance.

Deeside

12-07-2006

Flood Consequence Assessment for commercial development in Zone C1.

Egham

10-07-2006

Flood Risk Assessment for industrial extension in Zone 3a.

Pengeulan

04-07-2006

Flood Map Challenge for residential development alongside river presently designated Zone C2.

Tegid St Bala

03-06-2006

Flood Consequence Assessment for conversion of shop to residential Zone C1.

Mochdre

28-05-2006

Pipeline strength and distortion calculations for 800mm ductile iron pipe where filling over is proposed.

Knighton

25-05-2006

Drainage appraisal for 130 house development site.

Greenfield Valley

20-05-2006

Flood Risk Assessment for housing development alongside reservoir.

Preliminary Flood Consequence Assessment, Rhyl

20-05-2006

Preliminary assessment to advise on the likely outcome of a full Flood Consequence Assessment for conversion of an existing property into flats

FRA Glyn Ceiriog

15-05-2006

Commissioned to prepare a flood risk assessment report for two house development in Glyn Ceiriog. The land is some distance from the river and not classified as Zone C. Nonetheless the EA consider there is a flood risk, following consideration of another planning application on the flood plain in the near vicinity.

FRA Sealand

15-05-2006

Commissioned to prepare a flood risk assessment report for two property conversions at Sealand on the River Dee flood plain involving breach assessment and flood consequences.

FCA Former Hospital Site

06-05-2006

Appointed to advise on drainage and flood consequence for redevelopment of former hospital complex in North Wales. The area is classified zone C2 but a Flood Consequence Assessment may be permitted as the development represents a potential diminution of risk. The site use will be reduced to Highly Vulnerable as opposed to Emergency at present.

FCA Ceredigion

24-04-2006

Commissioned to prepare a flood consequence assessment report for ten house development near River Teifi in Ceredigion. The flood map may be wrong, but a flood map challenge is not required as the site has outline planning permission which predates TAN 15. Therefore an FCA, which is less onerous than a Flood Map Challenge, is considered sufficient.

FCA Bagillt

13-04-2006

Commissioned to prepare a flood consequence assessment report for a proposed housing development in Bagillt, Flintshire.

FRA Deeside

05-04-2006

Flood Risk Assessment submitted for a commercial development on the Deeside Industrial Estate Flintshire. Working in conjunction with Kilner the FRA considers the risk of tidal inundation due to possible failure of flood banks along the River Dee.

Emergency Planning Seminar

05-04-2006

Raff Whitehead of Waterco presented a paper entitled "Business Continuity Plans-Flood Risk" to the Emergency Planning Society in Aberystwyth. The seminar was attended by 40 delegates from the local authorities and emergency services across Wales. Other presenters, all on the Business Continuity theme, included Ian Dunlop, Marsh Insurance, Mark Heywood, Sevens Insight and Consulting, Eddie Coventry, Gloucestershire County Council and Robin Goddum, IBM.

Mike 11 Flood

31-03-2006

Mike Flood modelling software purchased from DHI to complement existing HEC-RAS software. This programme allows 2D modelling of complex sections of waterway which provides a better understanding of flood susceptibility.

Underwater Survey Bury St Edmunds

30-03-2006

Waterco UES successfully completed the survey of adits on behalf of Anglian Water Services. The survey provided clear views of the adit and allowed AWS engineers to determine whether recent construction works in the vicinity had any adverse impact on the structure.