A full Flood Risk Assessment (or Flood Consequences Assessment, if in Wales) report carried out in accordance with the appropriate planning policy (NPPF, TAN15 or SPP).

If you have a question or can’t find what you need, give us a call on 01824 702220 or send an e-mail to enquiries@waterco.co.uk

SKU: N/A

  • Assess flood risk from all sources including review of Environment Agency / Natural Resources Wales flood mapping, topography, historical records and SFRA / PFRA
  • Advise on any flood risk constraints and mitigation measures
  • Prepare Flood Risk Assessment report

  • Assess flood risk from all sources including review of Environment Agency / Natural Resources Wales flood mapping, topography, historical records and SFRA / PFRA
  • Advise on any flood risk constraints and mitigation measures
  • Prepare Flood Risk Assessment report
  • Review existing conditions including sewer plans, British Geological Survey information and topographical information
  • Review LLFA drainage policies
  • Submit developer enquiry to LLFA
  • Analyse existing and proposed impermeable areas
  • Calculate existing runoff rates (excluding existing drainage system modelling)
  • Assess method of surface water runoff disposal (soakaway / watercourse / sewer)
  • Establish surface water discharge rate in consultation with the LLFA / sewerage undertaker
  • Estimate required attenuation volume using Microdrainage software
  • Advise on suitable forms of SUDS
  • Advise on drainage system maintenance measures
  • Advise on surface water treatment methods
  • Establish method of foul water drainage
  • Prepare concept drainage sketch (where development plan is available as dwg. format)
  • Prepare Drainage Strategy report

  • Assess flood risk from all sources using best available information including review of Environment Agency / Natural Resources Wales data and mapping / Hydraulic modelling results, topography, historical records and SFRA / PFRA
  • Submit developer enquiry to the EA
  • Advise on flood mitigation measures
  • Assess evacuation routes
  • Advise on availability of flood warnings
  • Qualitative assessment of impact of development on fluvial / tidal flood risk elsewhere (excludes flood compensatory storage design)
  • Prepare Flood Risk Assessment report

  • Assess flood risk from all sources using best available information including review of Environment Agency / Natural Resources Wales data and mapping / Hydraulic modelling results, topography, historical records and SFRA / PFRA
  • Advise on flood mitigation measures
  • Assess evacuation routes
  • Advise on availability of flood warnings
  • Qualitative assessment of impact of development on fluvial / tidal flood risk elsewhere (excludes flood compensatory storage design)
  • Review existing conditions including sewer plans, British Geological Survey information and topographical information
  • Review LLFA drainage policies
  • Submit developer enquiry to EA, LLFA and sewerage undertaker
  • Analyse existing and proposed impermeable areas
  • Calculate existing runoff rates (excluding existing drainage system modelling)
  • Assess method of surface water runoff disposal (soakaway / watercourse / sewer)
  • Establish surface water discharge rate in consultation with the LLFA / sewerage undertaker
  • Estimate required attenuation volume using Microdrainage software
  • Advise on suitable forms of SUDS
  • Advise on drainage system maintenance measures
  • Advise on surface water treatment methods
  • Establish method of foul water drainage
  • Prepare concept drainage sketch (where development plan is available as dwg. format)
  • Prepare Flood Risk Assessment & Drainage Strategy report

The fixed fee shown based upon your selection excludes the following:

  • A Sewerage Undertaker developer enquiry.   A member of the Waterco team will contact you to establish if a Sewerage Undertaker developer enquiry is necessary.
  • Flood Data
  • Detailed drainage design
  • Hydraulic modelling
  • Surface water management section
  • Flood compensatory storage calculations
  • Flood Warning & Evacuation Plan
  • Site visits
  • Attendance of meetings
  • Ongoing discussion with statutory consultees following final report provision
  • Additional Microdrainage simulations (added fee per additional discharge point)
  • Infiltration tests (can be provided if required)
  • Infiltration test analysis (can be provided if required)

If you require any of the above in addition to the product selected, please contact us to arrange a quote tailored to your needs.

The fixed fee includes:

  • Allows for one set of consolidated comments / amendments following first issue of report
  • Sewer plans (if Drainage strategy option is selected)
  • Site Address
  • Development plans (if available)
  • Topographical Survey (if available)

A ground Investigation report (if applicable) may also be requested upon a member of our team reviewing your enquiry.